This week in Lumut was pretty intense.

Within a span of 4 days, 2 major load outs have to be done.

One of it which was my pioneer project. Means I had to do every single engineering technical analysis from scratch, and monitor the progress of the load out.
However, being new to this, there were minor glitches, including wrong deduction of the current situation and even the limitation we have due to lack of experience of foreseeing the worst case scenario.

The Superintendent kept telling us that the beams were uneven, and the trailers could not be inserted underneath the cargo. However, lady luck was with me, when several contingencies were made, and the cargo was safely on board this evening.

Learnt a lot for this project. A good kick-start, I must say.

I have 2 more cargoes come this September, and am actually looking forward to it. The feeling of seeing it with my own eyes can be overwhelming.